Europe
Please follow the "Preview and download" link, below each image, in order to view a full size version. The image will open in a new browser window.
In order to save an image, right click on the image and select "Save Picture As...".
Installation of vibro stone columns Cheetham Hill, Manchester, UK
Preview and download
(585KB) |
Keller Grundbau treats settlement using its “Soilfrac” compensation grouting system during tunnelling below the main train station at Antwerp, Belgium
Preview and download
(539KB) |
Installation of mini piles to stabilise the Thames River wall, London, UK
Preview and download
(310KB) |
Execution of deep foundations for luxury apartments in the old town at Gdansk, Poland
Preview and download
(333KB) |
Installation of anchors to stabilise the embankments of the A2 motorway at Degen Dam in Austria
Preview and download
(395KB) |
Specialty grouting operations to prevent settlement during tunnelling operations at Leipzig, Germany
Preview and download
(795KB) |
Jet-grouting works to stabilise rail embankments during the construction of an HST line from Madrid to Barcelona, Spain
Preview and download
(443KB) |
Installation of foundations for a major distribution facility adjacent to the Dartford Crossing in Kent, UK
Preview and download
(308KB) |
Installation of driven piling through an existing floor slab at Thornton Heath, Surrey, UK
Preview and download
(86KB) |
Tunnel stabilisation works using jet grouting in Cologne, Germany
Preview and download
(490KB) |
|
|
Alert Service
Keep up to date with the latest news and publications - sign up for our Alert Service
Register for alerts
AGM
The 2012 Annual General Meeting of Keller Group plc will be held on 18 May 2012
AGM details