Contiguous pile walls consist of piles arranged in a line typically with a 150mm gap between the piles. Where required the soil between the piles can be stabilised using grouting techniques if necessary, either before or after pile installation.
We believe no one should be harmed as a result of the work we do or the services we provide. Our ultimate goal is to have zero incidents through the effective management of health and safety in all our operations.