Please select your location to see the most relevant information from Keller
Keller, along with JV partner VSL, are working in the Chiltern Tunnel pregrouting the cross passages that will service the two tunnels carrying HS2 trains under the Chiltern Hills. Watch as we carry out fissure grouting to reduce water ingress during their excavation.
Keller, along with JV partner VSL, have installed 292 large diameter rotary bored piles for the foundations of the Colne Valley Viaduct on Section C1 of HS2 Phase One.
Watch Keller installing piles for the world's largest monopile manufacturing facility.
Keller installing soil nails to strengthen a section of embankment on the Hope Valley railway line between Sheffield and Manchester.
Watch as Keller carries out Dynamic compaction to prepare the ground for a new housing development
Keller in collaboration with Network Rail, Story Contracting and scheme designer Pell Frischmann were tasked with providing a permanent solution to the ongoing subsidence caused by landslip along slip faults located underneath a section of the East Coast rail line near Morpeth, Northumberland.
Watch as piling, jet grouting and instrumentation and monitoring work is carried out by Keller UK and her sister company GEO-Instruments as part of the £37m redevelopment of historic Oxford building.
Installing rigid inclusions at the port of Hull
Watch how we install vibro stone columns to support a variety of structures
Drone footage of the installation of Textomur reinforced soil structures at the A465 Heads of the Valley road in South Wales.
The installation of a king post wall at Napier Park, Luton