Keller, along with JV partner VSL, are working in the Chiltern Tunnel pregrouting the cross passages that will service the two tunnels carrying HS2 trains under the Chiltern Hills. Watch as we carry out fissure grouting to reduce water ingress during their excavation.
Keller, along with JV partner VSL, have installed 292 large diameter rotary bored piles for the foundations of the Colne Valley Viaduct on Section C1 of HS2 Phase One.
Watch Keller installing piles for the world's largest monopile manufacturing facility.
Building the foundations for a sustainable future
Keller installing soil nails to strengthen a section of embankment on the Hope Valley railway line between Sheffield and Manchester.
Watch as Keller carries out Dynamic compaction to prepare the ground for a new housing development
Keller in collaboration with Network Rail, Story Contracting and scheme designer Pell Frischmann were tasked with providing a permanent solution to the ongoing subsidence caused by landslip along slip faults located underneath a section of the East Coast rail line near Morpeth, Northumberland.
Facts and figures about Keller globally