Bored piles are a very effective, state-of-the-art construction element with many applications in foundation and civil engineering.
Process
A temporary casing is installed and soil drilled out using specialised tools. If the hole requires support to remain open, additional casing or, occasionally, drilling fluid can be used. Full length reinforcing steel is lowered into the hole which is then filled with concrete. Bored piles can be drilled to depths in excess of 60m and typical diameters range up to 2.4m.
Specialist Contact | Karl Roulstone - [email protected] - +44 (0)7721 813718
Common uses
- As heavy foundations, securing deep excavation especially close to existing buildings as well as stabilising and retaining slopes
- In a variety of infrastructure projects such as tunnelling, road or bridge construction as well as flood protection
- Transfer to deep rock or competent soils and withstand high loads
- Retain ground alongside an excavation pit or close to adjacent buildings, often combined with other techniques such as ground anchors or soil nails
- For slope stabilisation to prevent landslides, or protect existing buildings
Advantages
- Can support high loads
- Various diameters available from 450mm upwards
- Minimal settlement and deformation
- Minimum vibration
Quality assurance
We use a variety of quality assurance methods for our products including top down and integrity testing, bottom bi-directional pile load tests, and digital recording and logging of the execution parameters.
Watch our video at Morpeth
Related techniques
Related resources
Related projects
Infrastructure
Finham Sewage Treatment Works
Pile Design and installation for storm water new tank foundations.
Provided a low vibration cast in-situ solution
Early contractor involvement allowed working platform and site logistics to be effectively managed to maximise efficiencies on site.
‘Keller completed their piling works efficiently and provided all quality assurance documentation in a timely manner. Keller’s site team integrated effectively and took a lead on the start of shift briefings.’ (Client Senior PM)
Infrastructure
Havant Budds Farm Sewage Treatment Works
Secant Wall Design and installation for storm water new tank shaft.
Provided a low vibration cast in-situ solution
Early contractor involvement allowed a combined secant wall and grouting solution to be developed for scheme.
Infrastructure
Hartlepool Station Upgrade
As part of a £12m upgrade at the ageing Hartlepool Railway Station, a new platform and canopies were built and the station made more accessible as part of the Department for Transport’s Access for All programme.
Commercial
90 Long Acre
Originally built in the 1970s, Long Acre is a 240,000 sq ft landmark building in one of London's most popular areas. It is an iconic but obsolete Brutalist building in need of an upgrade.
Infrastructure
Blue Mountain Permanent Remediation
Keller were asked to provide a ground engineering solution for a continuing landslip remediation project on the East Coast mainline in Morpeth, Northumberland.