Slurry walls are constructed using a cement-bentonite slurry to produce a below ground low permeability barrier.
Rock grouting is normally done in fissured rock to reduce the flow of water along the joints and discontinuities in the rock.
Compaction grouting involves the injection of a low slump, mortar grout to densify loose, granular soils and stabilise subsurface voids or sinkholes.