Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (306)
  • Project (99)
  • Resource (56)
  • News article (53)
  • Content page (29)
  • Technique (29)
  • Solution (12)
  • Event (8)
  • Market (8)
  • Office (8)
  • Vacancy (4)
Request a quote
Get assistance
Download
Keller at a glance
Resource
Facts and figures about Keller globally
/node/3956
Download
Keller Gender Pay Gap Report 2021
Resource
Gender pay gap reporting for Keller UK
/node/4026
Download
Sustainability
Resource
Enabling low-impact, low carbon construction
/node/4121
Download
https://youtu.be/CH1U-vGILek
Bored Piling at Morpeth
Resource
Keller in collaboration with Network Rail, Story Contracting and scheme designer Pell Frischmann were tasked with providing a permanent solution to the ongoing subsidence caused by landslip along slip faults located underneath a section of the East Coast rail line near Morpeth, Northumberland.
/node/4171
Download
https://youtu.be/ieTWHUXNrBE
Dynamic compaction at Skelton Gate, Leeds
Resource
Watch as Keller carries out Dynamic compaction to prepare the ground for a new housing development
/node/4176
Download
https://youtu.be/6jDC38_M7yw
Soil nailing at Hope Valley
Resource
Keller installing soil nails to strengthen a section of embankment on the Hope Valley railway line between Sheffield and Manchester.
/node/4306
Download
Keller Gender Pay Gap Report 2022
Resource
Gender pay gap reporting for Keller UK
/node/4316
Download
Sustainability at Keller
Resource
Building the foundations for a sustainable future
/node/4326
Download
https://youtu.be/QfhqC-OX1U8
Monopile Manufacturing Facility, Teesside - CFA and Rotary Bored Piling
Resource
Watch Keller installing piles for the world's largest monopile manufacturing facility.
/node/4376
Download
HSEQ Policy Statement
Resource
Keller UK's HSEQ policy statement 2024
/node/4406
Download
https://youtu.be/_vGoEfRttfU
HS2 Section C1 - Colne Valley Viaduct
Resource
Keller, along with JV partner VSL, have installed 292 large diameter rotary bored piles for the foundations of the Colne Valley Viaduct on Section C1 of HS2 Phase One.
/node/4411
Download
https://youtu.be/Q9ZYhq6lNDA
HS2 Section C1 - Chiltern Tunnel Cross Passages Grouting
Resource
Keller, along with JV partner VSL, are working in the Chiltern Tunnel pregrouting the cross passages that will service the two tunnels carrying HS2 trains under the Chiltern Hills. Watch as we carry out fissure grouting to reduce water ingress during their excavation.
/node/4416
Download
Carbon Reduction Plan UK
Resource
Keller Limited is committed to achieving Scope 2 Net Zero emissions by 2030, Scope 1 by 2040 and Scope 3 Operations by 2050.
/node/4431
Download
Keller Gender Pay Gap Report 2023
Resource
Gender pay gap reporting for Keller UK
/node/4506
Download
Pension Implementation Statement 2022
Resource
Pension Implementation Statement 2024
/node/4531
Download
Keller Gender Pay Gap Report 2024
Resource
2024 Gender Pay Gap Reporting for Keller UK
/node/4601
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo