Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Careers
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Wet soil mixing
        • Mixed modulus columns CMM ®
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
        • Helical piles
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
 Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (255)
  • Project (76)
  • Resource (44)
  • News article (43)
  • Technique (30)
  • Content page (21)
  • Solution (12)
  • Market (8)
  • Office (8)
  • Event (7)
  • Vacancy (6)
Request a quote
Get assistance
Horfield Cutting
Project
/projects/horfield-cutting
Four Ashes
Project
/projects/four-ashes
A3 Dual Carriageway Link
Project
/projects/a3-dual-carriageway-link
Chapel House Reservoir
Project
/projects/chapel-house-reservoir
Crossrail C300/C410
Project
/projects/crossrail-c300c410
Erith Distribution Warehouse
Project
/projects/erith-distribution-warehouse
Felixstowe South Reconfiguration, Phase 1
Project
/projects/felixstowe-south-reconfiguration-phase-1
Down Leisure Centre
Project
/projects/down-leisure-centre
REnescience Bio Plant
Project
/projects/renescience-bio-plant
Olympic Stadium, Queen Elizabeth Park
Project
/projects/olympic-stadium-queen-elizabeth-park
Crossrail C298
Project
/projects/crossrail-c298
Great Yarmouth Flood Alleviation Scheme
Project
/projects/great-yarmouth-flood-alleviation-scheme
Shirebrook Distribution Depot
Project
/projects/shirebrook-distribution-depot
Beckton STW Shaft Construction
Project
/projects/beckton-stw-shaft-construction
Henrietta Street Bridge Replacement Scheme
Project
/projects/henrietta-street-bridge-replacement-scheme
Drump Road
Project
/projects/drump-road
Fletton Quays
Project
/projects/fletton-quays
East Kent Access Road
Project
/projects/east-kent-access-road
Corsham Aqueduct
Project
/projects/corsham-aqueduct
Shoreham Port Wind Turbines
Project
/projects/shoreham-port-wind-turbines
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2022 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Twitter
  • YouTube
Federation of Piling Specialists accredited logo
Leaders in Diversity logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award
Women in Construction logo
FPS Awards winner logo