Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (303)
  • Content page (29)
  • Event (8)
  • Market (8)
  • News article (53)
  • Office (8)
  • Project (99)
  • Resource (56)
  • Solution (12)
  • Technique (29)
  • Vacancy (1)
Request a quote
Get assistance
Horfield Cutting
Project
/projects/horfield-cutting
Four Ashes
Project
/projects/four-ashes
A3 Dual Carriageway Link
Project
/projects/a3-dual-carriageway-link
Chapel House Reservoir
Project
/projects/chapel-house-reservoir
Crossrail C300/C410
Project
/projects/crossrail-c300c410
Erith Distribution Warehouse
Project
/projects/erith-distribution-warehouse
Felixstowe South Reconfiguration, Phase 1
Project
/projects/felixstowe-south-reconfiguration-phase-1
Down Leisure Centre
Project
/projects/down-leisure-centre
REnescience Bio Plant
Project
/projects/renescience-bio-plant
Olympic Stadium, Queen Elizabeth Park
Project
/projects/olympic-stadium-queen-elizabeth-park
Crossrail C298
Project
/projects/crossrail-c298
Great Yarmouth Flood Alleviation Scheme
Project
/projects/great-yarmouth-flood-alleviation-scheme
Shirebrook Distribution Depot
Project
/projects/shirebrook-distribution-depot
Beckton STW Shaft Construction
Project
/projects/beckton-stw-shaft-construction
Henrietta Street Bridge Replacement Scheme
Project
/projects/henrietta-street-bridge-replacement-scheme
Drump Road
Project
/projects/drump-road
Fletton Quays
Project
/projects/fletton-quays
East Kent Access Road
Project
/projects/east-kent-access-road
Corsham Aqueduct
Project
/projects/corsham-aqueduct
Shoreham Port Wind Turbines
Project
/projects/shoreham-port-wind-turbines
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo