Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Wet soil mixing
Mixed modulus columns CMM ®
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Nuclear
Advanced
Manufacturing Research Centre
Project
… carbon impact. … Derby … The construction of a 46,700 sq ft Nuclear
Advanced
Manufacturing Research Centre (NAMRC) facility within the … course of the works. Almost 1000 columns were successfully installed
in
three weeks with a total carbon impact of 125tCO2e. As the RI …
/projects/nuclear-
advanced
-manufacturing-research-centre
Marble Arch Place
Project
… the deep basement, a diaphragm wall was required. This posed a risk
in
destabilising the adjacent Great Cumberland Place building, a … Marble Arch Place development is one of the most prestigious
recent
construction projects
in
London. Two Keller UK divisions worked … provided to determine the extents of the jet grouting required. A 3D
BIM
model was used for the detailed design, to risk assess each column …
/projects/marble-arch-place
Crag End Landslip
Project
… of their geotechnical solutions to stabilise a 300m stretch of road
in
challenging ground condtions. … Crag End, Northumberland … … piles with a 450mm 3m-long rock socket using a Bulroc hammer, which
in
turn was retained by 144 No up to 32m long SBMA ground anchors. The …
/projects/crag-end-landslip
Upper Holloway Bridge
Project
… anchors to resist 155kN axial loads to support the existing abutments
in
the temporary loading condition when the old Victorian bridge deck … Road Rail Vehicles, so that the angles required could be achieved.
BIM
modelling was used to design the anchor direction and on site …
/projects/upper-holloway-bridge
Olympic Stadium, Queen Elizabeth Park
Project
… had to be demolished. Keller had experience of piling the site
in
the 1970s and 1980s and their knowledge of the ground conditions was invaluable
in
suggesting different treatments for different areas. … A total of 500 vibro concrete columns were founded
in
the Terrace Gravels under the lighter parts of the structure around …
/projects/olympic-stadium-queen-elizabeth-park
Recycling facility, Reliance Street
Project
… new facility also straddled a deep backfilled pit with a variation
in
made ground of circa 7m. … Keller UK … I&H Brown … Suez Recycling & … were redeveloping and expanding an existing waste recycling facility
in
Newton Heath, Manchester. … Manchester … Keller were brought
in
to provide a ground treatment solution that could accommodate the …
/projects/recycling-facility-reliance-street
90 Long Acre
Project
… … Arup … Keller UK … McGee … Northwood Investors … Originally built
in
the 1970s, Long Acre is a 240,000 sq ft landmark building
in
one of London's most popular areas. It is an iconic but obsolete Brutalist building
in
need of an upgrade. … Covent Garden, London … Set to complete
in
…
/projects/90-long-acre
A465 Heads of the Valley road
Project
… walls … The A465 is a key strategic corridor connecting the M4
in
South Wales to England. A study
in
the 1990s identified that improvement of the road was critical to the … of 24No Textomur reinforced soil structures totalling 24,250m²
in
length. The Textomur was installed at angles from 60-70 degrees and …
/projects/a465-heads-valley-road
Bilston Urban Village
Project
… variable and coarse fill while maintaining the normal tolerances
in
plan and verticality. A number of the stone columns were required … Urban Village … Keller provided a cost and carbon saving option
in
challenging site conditions on a regeneration project. Close … & structural consultants demonstrated the value of early involvement
in
the scheme. … West Midlands … The regeneration of a large brownfield …
/projects/bilston-urban-village
Leeds Logic Industrial Park, Plot B
Project
… the soil nails … The soil nailed slope … Soil nail installation
in
very stiff clay and weathered mudstone and challenging logistics and … Keller installed soil nails to the face of the slope cut by others
in
a top to down sequence and Phi Group installed gabion cladding. … …
/projects/leeds-logic-industrial-park-plot-b