Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (28)
  • Content page (0)
  • Event (0)
  • Landing page (1)
  • Market (0)
  • News article (6)
  • Office (0)
  • Project (15)
  • Resource (3)
  • Solution (0)
  • Technique (3)
  • Vacancy (0)
Request a quote
Get assistance
Keller divisions combine for major London river project
News article
… specialist minipiles and carrying out groundwater monitoring.   Data collection set up at Duke Shore Wharf The small but critical site at Duke Shore Wharf is part of the Environment Agency’s 10-year plan to strengthen and repair tidal flood … the piling works with GEO-Instruments providing Instrumentation and monitoring. Located near Limehouse in central London, the site is adjacent to residential buildings and has limited …
/news/keller-divisions-combine-major-london-river-project
GEO-Instruments launch new version of Quickview software
News article
… is optimised for touchscreen interfaces. This update will be rolled out to all clients in the near future. Published on 10 Jun 2019 … GEO-Instruments, the monitoring and instrumentation …
/news/geo-instruments-launch-new-version-quickview-software
Keller UK focuses on cutting carbon
News article
… to do and the key is employee engagement. An aerial view of the Keller UK offices at Ryton, near Coventry It might not be the most glamorous or innovative solution, but a simple change at … emissions are classed as Scope 1 (those directly produced by Keller) and Will’s plan in the near future is to build a clear strategy for reducing them. One of the ways Keller UK is doing …
/news/keller-uk-focuses-cutting-carbon
Keller receives RoSPA Gold Award - again
News article

KELLER UK has received a major award for demonstrating high health and safety standards for the second consecutive year.

/news/keller-receives-rospa-gold-award-again
Keller carry out rail line stabilisation works
News article
… Rail’s Capital Delivery Eastern team, the critical works to the 130-year-old embankment near Morpeth Station will protect the line for years to come. The work was carried out in two …
/news/keller-carry-out-rail-line-stabilisation-works
Keller stalwart Mark Bragg retires after 44 years
News article
… we first told to wear hi-vis clothing people didn’t want to but you wouldn’t dream of going near a site now without the proper PPE." The facilities on site have also improved considerably. …
/news/keller-stalwart-mark-bragg-retires-after-44-years
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo