Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
South Cliff Stabilisation Scheme
Project
… To dissipate the loads,
a
detailed moment analysis was performed by the project engineers which … practice, ongoing site operations and interaction with other works. …
Keller
UK … Balfour Beatty … Environment Agency … Scarborough Borough … of the South Cliff, which was unstable. Working with Balfour Beatty,
Keller
helped provide
a
solution to stabilise the cliff face and protect …
/projects/south-cliff-stabilisation-scheme
Pole Rue Water Treatment Centre
Project
… The main challenge was to complete the piling works within
a
very tight programme for the client with restricted access into site for piling rigs and associated equipment. …
Keller
UK … Wessex Water … Wessex Water … Bored piling at Pole Rue WTC … … sufficient water supply to the local area. … Chard, Somerset …
Keller
, in partnership with Wessex Water, designed suitable piled …
/projects/pole-rue-water-treatment-centre
A465 Heads of the Valley (Rock Anchors)
Project
…
Keller
were employed to install rock anchors, up to 13 strands and … area was very narrow and near protected trees and overhead cables. …
Keller
UK … Costain … Welsh Government … The anchors being installed … The A465 is
a
key strategic corridor connecting the M4 in South Wales to England.
A
…
/projects/a465-heads-valley-rock-anchors
Great Yarmouth Flood Alleviation Scheme
Project
… anchor loads (c. 800kN Axial SWL) under consideration. … CH2M HILL …
Keller
UK … Interserve Construction Limited … Environment Agency … SBMA ground anchors at Great Yarmouth … Following
a
series of flooding incidents since the 1953 Great Storm in which many … flood protection was significantly upgraded. … Great Yarmouth …
Keller
were awarded the contract to install and test both the …
/projects/great-yarmouth-flood-alleviation-scheme
Beam Reach Business Park
Project
… One of the four units had
a
complication. It was located adjacent to the HS1 rail line and
a
… the risk of asbestos and working adjacent to high voltage cables. …
Keller
UK … Readie Construction … Segro … Driven cast insitu at Beam … industrial units by Readie Construction. On this project, they chose
Keller
's displacement piling as
a
means of avoiding spoil generation. … …
/projects/beam-reach-business-park
Recycling facility, Reliance Street
Project
… To minimise the environmental impact it was decided to provide a
rigid
inclusion solution where possible as it offered cost and carbon … … Keller UK … I&H Brown … Suez Recycling & Recovery UK … Installing
rigid
inclusions
at Reliance Street … Suez Recycling & Recovery UK were …
/projects/recycling-facility-reliance-street
Crown Dock
Project
… hampered by the requirement to keep the waterway open to traffic, so
a
crawler based rig from
a
jack up barge was excluded, and on land … at the anchor locations. Tides also affected the access times and
Keller
had to work around them. …
Keller
UK … BMMJV (BAM Nuttall/Mott Macdonald) … Port of Hull … …
/projects/crown-dock
Jackfield Stabilisation Project
Project
… The main challenge was safely installing the 18m long piles using
a
heavy Soilmec SR80 rig which had the ability to bore into mudstone … piling mat being carefully monitored for signs of movement by Getec,
Keller
's monitoring and instrumentation company. The sequence of work was carefully planned due to the high risk of ground movement. …
Keller
UK/Getec … McPhillips Ltd … Telford & Wrekin Council … CFA piling …
/projects/jackfield-stabilisation-project
Herns Lane
Project
… exercise had proved the location of the features beneath the site and
Keller
were appointed to treat all of these. The main challenge was to position rigs in such
a
way that the identified features could be infilled without the rig …
a
geogrid layer to decrease the risk of rig collapse into
a
void. …
Keller
UK … Crest Nicholson … Crest Nicholson … Compaction grouting at …
/projects/herns-lane
Benjamin Street
Project
… all party wall and approval in principle issues to be addressed. …
Keller
UK … Knight Harwood … Girdlers of London …
A
secant pile wall at Benjamin Street …
Keller
were asked to install CFA piles for
a
secant piled wall to form
a
…
/projects/benjamin-street
Epping Forest Retail Park
Project
… … Epping Forest Retail Park … The rear of the site was underlain by
a
wedge of fill materials up to 7.5m thick towards. In turn this is … development in these variable and difficult ground conditions. …
Keller
UK/Phi Group … McLaughlin & Harvey … Polofind Ltd … Work … reinforced soil slope at Epping … This was
a
project where two
Keller
UK divisions worked together to provide
a
value solution for the …
/projects/epping-forest-retail-park
Bilston Urban Village
Project
… The client wanted
a
rapid foundation solution that avoided the use of heavily reinforced raft foundations or concrete piles.
Keller
needed to treat up to 14m of highly variable and coarse fill … to existing buildings, large retaining walls and buried services. …
Keller
UK … Countryside Properties plc … Countryside Properties plc … …
/projects/bilston-urban-village
Crossrail C300/C410
Project
… populated area of high value and containing critical assets. …
Keller
UK … Bam Ferrovial/Kier JV … Crossrail … Compensation grouting on … tunnels and 10 new stations across 40 construction sites. … London …
Keller
carried out the Compensation grouting works as mitigation to the …
/projects/crossrail-c300c410
Drump Road
Project
… the limited blockade time 24-hour working was necessary. … Ove Arup …
Keller
UK … Balfour Beatty … Network Rail … Network Rail identified an … of the mine shaft, engineers Ove Arup and Network Rail developed
a
solution to treat the former mine workings using piling.
Keller
offered
a
design and build solution using jet grouting as an …
/projects/drump-road
Olympic Stadium, Queen Elizabeth Park
Project
… each geotechnical or structural loading scenario. … Buro Happold …
Keller
UK … Sir Robert McAlpine … Olympic Delivery Authority … Vibro concrete columns at the Olympic Stadium …
Keller
used
a
number of different piling techniques for the foundations of the …
/projects/olympic-stadium-queen-elizabeth-park
Fletton Quays
Project
… All the piles were manufactured and installed with pre-stressing. …
Keller
UK … Weston Homes … Weston Homes … Precast piling at Fletton Quays …
Keller
have installed approximately 1800 driven precast concrete piles … tall. We were able to keep to the programme requirements using
a
single rig that regularly installing more than 40 piles
a
day. … Each …
/projects/fletton-quays
Crag End Landslip
Project
… on an unstable slope and then install under the working platform
a
series of ground anchors designed to restrain the piles through
a
… glacial clays, materials notoriously difficult to drill. … Atkins …
Keller
UK … Volker Slevin … Northumberland County Council … Bored piles at Crag End …
Keller
used two of their geotechnical solutions to stabilise
a
300m …
/projects/crag-end-landslip
Leeds Logic Industrial Park, Plot B
Project
… clay and weathered mudstone and challenging logistics and planning. …
Keller
UK … Phi Group … Bowmer & Kirkland … Bowmer & Kirkland … Gabions on the slope … The development is
a
new unit at Logic Park Industrial Park, Leeds and required regrading … package of soil nailing and facing system. During the main works
Keller
installed soil nails to the face of the slope cut by others in
a
…
/projects/leeds-logic-industrial-park-plot-b
Woodsmith Polyhalite Mine
Project
…
Keller
's rig working in the shaft … Due to specific locations the whole … but in this case this method was not allowed by the client. …
Keller
UK … Careys Civil Engineering … Sirius Minerals … An overhead … Minerals are developing the world’s largest mine for polyhalite,
a
naturally occurring fertilizer used in agriculture. As the site is in …
/projects/woodsmith-polyhalite-mine
Henrietta Street Bridge Replacement Scheme
Project
… need to retain and strengten the existing bridge abutments … Opus …
Keller
UK … J Murphy and Sons … Network Rail … Work on bridge replacement in Manchester …
Keller
actively got involved at an early stage with the contractor and designers to produce
a
cost-effective, valued and buildable scheme. … Manchester …
A
Pali …
/projects/henrietta-street-bridge-replacement-scheme