Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (312)
  • Project (103)
  • Resource (56)
  • News article (53)
  • Content page (29)
  • Technique (29)
  • Solution (12)
  • Event (8)
  • Market (8)
  • Office (8)
  • Landing page (4)
  • Vacancy (2)
Request a quote
Get assistance
Download
Keller Capabilities
Resource
Keller Capabilities Keller Capabilities brochure 2023 Infosheet Check out the widest range of geotechnical solutions in the UK plus the products offered by our sister companies, Phi Group and GEO-…
/node/2756
Corsham Aqueduct
Project
Corsham Aqueduct A new aqueduct was required over the Great Western Railway in Wiltshire as part of electrification plans. Minipiling at Corsham Aqueduct Minipiling at Corsham Aqueduct The project…
/projects/corsham-aqueduct
Shoreham Port Wind Turbines
Project
Shoreham Port Wind Turbines To provide the Shoreham Port facilities with a form of green energy, the Port needed to built two nED100-type wind turbines on the shoreline. Minipiling at Shoreham Port…
/projects/shoreham-port-wind-turbines
Epping Forest Retail Park
Project
Epping Forest Retail Park This was a project where two Keller UK divisions worked together to provide a value solution for the client. Keller foundations provided vibro treatment while Phi Group…
/projects/epping-forest-retail-park
Beam Reach Business Park
Project
Beam Reach Business Park The former Ford car factory in Dagenham is now primarily an engine plant and some parts of the site have been redeveloped into new factories and distribution units. Driven…
/projects/beam-reach-business-park
Jackfield Stabilisation Project
Project
Jackfield Stabilisation Project Jackfield is a well known area of historic active landslip at one of the narrowest points on the River Severn in Shropshire. It is located 1km downstream of Ironbridge…
/projects/jackfield-stabilisation-project
Hansford Park
Project
Hansford Park Keller made two visits to Hansford Park development on the site of the old Radio Mast in Rugby to install driven precast piles on former farmland where there were concerns over how the…
/projects/hansford-park
141 Harley Street
Project
141 Harley Street Keller's specialist restricted access team designed and constructed a 73 linear metre secant piled retaining wall and a 35 linear metre contiguous piled retaining wall using…
/projects/141-harley-street
Betley Waste Water Treatment Works
Project
Betley Waste Water Treatment Works Keller were called in to offer a foundations solution for the installation of 1.0m diameter waste water pipe as part of the Betley WwTW project. Keller UK completes…
/projects/betley-waste-water-treatment-works
Heathrow Airport
Project
Heathrow Airport Careful planning of the logistics before work started onsite was the key to the successful completion of this project, which involved working airside at a major international airport…
/projects/heathrow-airport
Crag End Landslip
Project
Crag End Landslip Keller used two of their geotechnical solutions to stabilise a 300m stretch of road in challenging ground condtions. Bored piles at Crag End Bored piles at Crag End The project…
/projects/crag-end-landslip
Herns Lane
Project
Herns Lane An unusual treatment for a housing site which goes to prove that whatever the ground conditions, Keller has the solution. Compaction grouting at Herns Lane Compaction grouting at Herns…
/projects/herns-lane
Victoria Station upgrade
Project
Victoria Station upgrade As part of the £700m upgrade of London's Victoria Station, Keller undertook what was at the time Europe's largest jet grouting project using Building Information…
/projects/victoria-station-upgrade
Download
Jet grouting brochure
Resource
Jet grouting brochure Jet grouting brochure Brochure An efficient and versatile method for soil treatment Download
/node/2831
New Cross shaft
Project
New Cross shaft Keller was called in to reduce the permeability of the chalk in a shaft which was to be a starter pit for a new power cable tunnel beneath the River Thames. Permeation grouting at New…
/projects/new-cross-shaft
Marble Arch Place
Project
Marble Arch Place To the north of Park Lane overlooking Hyde Park, the £400million Marble Arch Place development is one of the most prestigious recent construction projects in London. Two Keller UK…
/projects/marble-arch-place
Download
CFA piling brochure
Resource
CFA piling brochure CFA piling brochure Brochure A fast and economical piling solution for a variety of applications. Ideal for sensitive built-up areas and unstable soil. Download
/node/2846
Download
Vibro brochure
Resource
Vibro brochure Vibro brochure Brochure Where ground improvement begins Download
/node/2851
Download
Rigid inclusions brochure
Resource
Rigid inclusions brochure Rigid Inclusions brochure Brochure Efficient reduction of settlement Download
/node/2856
Download
Driven piles brochure
Resource
Driven piles brochure Driven piles brochure Brochure Often the most cost effective deep foundation solution, driven piles can be concrete or steel. Unlike bored piles they do not produce any spoil.…
/node/2861

Pagination

  • Previous page ‹‹
  • Page 4
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo