Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Duke Shore Wharf
Project
… with the need to prevent pollution of the river from the grouting and
piling
works. Also the works were within 4m of occupied residential …
/projects/duke-shore-wharf
Tesco Store
Project
… very weak soils, so as to avoid the cost and legacy associated with
piling
and fully suspended construction. … Keller UK … ISG Retail … …
/projects/tesco-store
Coastal protection
Project
/projects/coastal-protection
Blue Mountain Permanent Remediation
Project
… of the sectional CHS were undertaken on site utilising bespoke Keller
piling
rigs. All stages of the work were carefully planned and executed, delivering a safe system of work to the client. … Bored
piling
at Blue Mountain Permanent Remediation project, Morpeth … Europe …
/projects/blue-mountain-permanent-remediation
Project Mint, O2 Arena
Project
/projects/project-mint-o2-arena
Four Ashes
Project
/projects/four-ashes
Hartlepool Station Upgrade
Project
… The challenge for the
piling
works was to be able to work within a working station without …
/projects/hartlepool-station-upgrade
Shoreham Port Wind Turbines
Project
/projects/shoreham-port-wind-turbines
Westbury Hotel
Project
… 709 had to be delivered via special transport. Our Electric FF4 & FF1
Piling
Rigs worked at the B2 basement level. The FF4 had to be broken …
/projects/westbury-hotel
National Gallery
Project
… Keller were challenged by Careys and Arup to provide restricted access
piling
and grouting systems and assist in reducing the ingress of water …
/projects/national-gallery
Project Munio
Project
… installed using 600mm Sectional Flight Augers with a Klemm 709 bored
piling
rig. … Europe …
/projects/project-munio
McArthur Glen Shopping Centre
Project
/projects/mcarthur-glen-shopping-centre
90 Long Acre
Project
/projects/90-long-acre
Henrietta Street Bridge Replacement Scheme
Project
/projects/henrietta-street-bridge-replacement-scheme
South Cliff Stabilisation Scheme
Project
/projects/south-cliff-stabilisation-scheme
Bilston Urban Village
Project
/projects/bilston-urban-village
Boston Tidal Barrier
Project
/projects/boston-tidal-barrier
Rhodes House Redevelopment
Project
… building meant that there must be intensive monitoring throughout the
piling
and jet grouting works to examine the influence on the building. … building in Oxford. … Oxford … Keller have been undertaking
piling
and jet grouting works at Rhodes House over the last few months … structure gives a complete picture of the impact and efficacy of the
piling
and grouting measures. GEO-Instruments remained to work closely …
/projects/rhodes-house-redevelopment
Longbridge
Project
… were able to offer their King post wall solution. … Using our SF65
piling
rig, 750mm diameter bores were completed to a maximum depth of …
/projects/longbridge
Vanguard Self-Storage
Project
… the load distribution layer was just 400mm and this doubled up as the
piling
mat for the Keller rig. … Europe …
/projects/vanguard-self-storage
Show more results