Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (302)
  • Content page (28)
  • Event (8)
  • Market (8)
  • News article (53)
  • Office (8)
  • Project (99)
  • Resource (56)
  • Solution (12)
  • Technique (29)
  • Vacancy (1)
Request a quote
Get assistance
Keller appointed to Transpennine rail upgrade programme
News article

Keller UK has been appointed to the piling framework for the West of Leeds section of the Transpennine Route Upgrade programme.

/news/keller-appointed-transpennine-rail-upgrade-programme
Luke wins FPS Chair's Award
News article

Keller's Luke Deamer, our UK-based doctoral practitioner in sustainability, has been awarded the Federation of Piling Specialists' Chair's Award.

/news/luke-wins-fps-chairs-award
Keller sponsors Rugby Town Girls and Women Football Club
News article

Keller has sponsored a local girls’ and women’s football club to allow them to buy a piece of equipment to help improve their performance on and off the pitch.

/news/keller-sponsors-rugby-town-girls-and-women-football-club
Download
https://youtu.be/CH1U-vGILek
Bored Piling at Morpeth
Resource
Keller in collaboration with Network Rail, Story Contracting and scheme designer Pell Frischmann were tasked with providing a permanent solution to the ongoing subsidence caused by landslip along slip faults located underneath a section of the East Coast rail line near Morpeth, Northumberland.
/node/4171
Blue Mountain Permanent Remediation
Project
/projects/blue-mountain-permanent-remediation
Download
https://youtu.be/ieTWHUXNrBE
Dynamic compaction at Skelton Gate, Leeds
Resource
Watch as Keller carries out Dynamic compaction to prepare the ground for a new housing development
/node/4176
90 Long Acre
Project
/projects/90-long-acre
Clive Booth Student Village
Project
/projects/clive-booth-student-village
B&M Retail Unit
Project
/projects/bm-retail-unit
Keller UK MD Bob Thompson stepping down
News article

Keller UK Managing Director Bob Thompson is stepping down at the end of 2022 after seven years in the role.

/news/keller-uk-md-bob-thompson-stepping-down
Westbury Hotel
Project
/projects/westbury-hotel
Keller carry out rail line stabilisation works
News article

Keller spent much of 2022 working on a complex slope stabilisation project on the East Coast Mainline in Morpeth, Northumberland.

/news/keller-carry-out-rail-line-stabilisation-works
Skelton Gate
Project
/projects/skelton-gate
Bauer Keller JV secures piling work for monopile facility
News article

The Joint Venture of Bauer Technologies (a subsidiary of the BAUER Group), and Keller UK (a subsidiary of Keller Group), has been awarded the piling contract for the construction of a new £300 million wind turbine monopile manufacturing facility in Teesside, which when fully operational, is…

/news/bauer-keller-jv-secures-piling-work-monopile-facility
McDonald's Restaurant
Project
/projects/mcdonalds-restaurant
Our apprentices on life at Keller
News article

For National Apprenticeship Week, we spoke to three of our apprentices to find out their experiences of learning at Keller.

/news/our-apprentices-life-keller
A KWIC chat with Anna Furtak
News article

To mark International Women’s Day 2023,  we spoke to Keller Women in Construction Europe committee member Anna Furtak, who is a Project Manager for our sister company GEO-Instruments. We discuss career, the importance of diversity – and looking after pet snakes.  

/news/kwic-chat-anna-furtak
Download
https://youtu.be/6jDC38_M7yw
Soil nailing at Hope Valley
Resource
Keller installing soil nails to strengthen a section of embankment on the Hope Valley railway line between Sheffield and Manchester.
/node/4306
What Ramadan means to me
News article

It's the month of Ramadan for Muslims across the world. We asked Keller Foundations Commercial Manager Yasar Nawaz what it means to him.

/news/what-ramadan-means-me
Download
Keller Gender Pay Gap Report 2022
Resource
Gender pay gap reporting for Keller UK
/node/4316
  • Show more results
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo