Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Rhodes House Redevelopment
Project
… strict time and access constraints before the ground works began.
A
comprehensive monitoring system would need to be installed all around … outside of the building whilst manoeuvring around concurrent works by
Keller
and Beard in the same space. … Watch
a
video of the project …
Keller
UK … GEO-Instruments … Beard Construction … Rhodes Trust … Video …
/projects/rhodes-house-redevelopment
Excel Exhibition Centre, Phase 3
Project
… while achieving minimal disturbance from noise and vibration. …
Keller
UK … Sir Robert McAlpine … Excel … ExCeL London is expanding its exhibition areas to include
a
new continuous event space to the east of the site. The Phase 3 … venue’s total event space by 25%, approximately 25,000sqm. … London …
Keller
offered
a
value engineered solution to the restricted access area …
/projects/excel-exhibition-centre-phase-3
Longbridge
Project
/projects/longbridge
Betley Waste Water Treatment Works
Project
/projects/betley-waste-water-treatment-works
Felixstowe South Reconfiguration, Phase 1
Project
… To treat hydraulically placed sand fill deposited in
a
reclamation area behind
a
combo sheet pile wall and meet tight performance criteria without damaging the quay wall. …
Keller
UK … Costain … Hutchison Ports … Felixstowe Port where
Keller
UK has completed vibro compaction … For this project,
Keller
…
/projects/felixstowe-south-reconfiguration-phase-1
Secant box test pit
Project
…
A
3D image of the secant wall box … Excavation of the wall begins … The … Canale Associates and consultants Ramsay and Chalmers, who involved
Keller
for advice from an early stage. The secant box methodology was
a
new technique to
Keller
UK but one which has been successfully utilised in other business …
/projects/secant-box-test-pit
Napier Park
Project
/projects/napier-park
Four Ashes
Project
… selection were critical for the successful completion of these works.
Keller
were able to offer
a
Soilmec SR80 which was able to achieve production rates required to attain contract programme duration. …
Keller
UK … Readie Construction … Bericote … Secant wall at Four Ashes … …
/projects/four-ashes
Woodsmith Mine Shaft
Project
…
Keller
were challenged by main contractor Joseph Gallagher to help … are installing 2No mining shafts deep into the Whitby mudstone, with
Keller
providing assistance in limiting the water ingress during the … period using specially adapted drilling and grouting plant to work in
a
confined space. …
Keller
UK … Joseph Gallagher … Sirius Minerals … …
/projects/woodsmith-mine-shaft
Shoreham Port Wind Turbines
Project
… The main challenge was installing the minipiles on
a
small restricted site between the edge of rock armour sea defences and … while ensuring the correct alignment and angle of installation. …
Keller
UK/Getec … Norvento Wind Energy UK … Shoreham Port … Minipiling … two nED100-type wind turbines on the shoreline. … Shoreham-on-Sea …
Keller
installed 24no minipiles to provide the foundations support to …
/projects/shoreham-port-wind-turbines
Head Office
Office
… Oxford Road … Ryton-on-Dunsmore … Coventry … CV8 3EG … foundations.uk@
keller
.com … Key contacts … Coventry …
Keller
UK …
/contact-us/
keller
-uk-head-office
London Power Tunnels 2
Project
…
Keller
were asked very early on to assist in developing
a
grouting scheme to reduce the permeability of the chalk to an … deep, and the site small, constrained and obstructed with services. …
Keller
UK … Hochtief/Murphy JV … National Grid … An aerial view of the …
/projects/london-power-tunnels-2
Marble Arch Place
Project
/projects/marble-arch-place
Earlswood Lakes
Project
… To install
a
flood alleviation scheme to help protect the local village from any … making
a
successful project very difficult to achieve. …
Keller
UK … Kier Utilities … The Canal and River Trust … Slurry wall at … flooding in certain areas around the reservoir. … Birmingham …
Keller
were contracted by Kier to construct and install
a
slurry cut off …
/projects/earlswood-lakes
Erith Distribution Warehouse
Project
…
A
tight 15-week programme which meant that
Keller
had to supply five … to keep two different types of rigs supplied and operational. …
Keller
UK … McLaren Construction … Ocado … Driven cast insitu piles at …
/projects/erith-distribution-warehouse
Project Churchill, Jaguar Land Rover
Project
… The main challenge was installing 60m of retaining wall for
a
retained height of 2.5m. Drainage and other site infrastructure had … planned new structure had to be considered in the design completed by
Keller
. …
Keller
UK … McLaren … Jaguar Land Rover … The king post wall at Jaguar …
/projects/project-churchill-jaguar-land-rover
South Cliff Stabilisation Scheme
Project
… To dissipate the loads,
a
detailed moment analysis was performed by the project engineers which … practice, ongoing site operations and interaction with other works. …
Keller
UK … Balfour Beatty … Environment Agency … Scarborough Borough … of the South Cliff, which was unstable. Working with Balfour Beatty,
Keller
helped provide
a
solution to stabilise the cliff face and protect …
/projects/south-cliff-stabilisation-scheme
Pole Rue Water Treatment Centre
Project
… The main challenge was to complete the piling works within
a
very tight programme for the client with restricted access into site for piling rigs and associated equipment. …
Keller
UK … Wessex Water … Wessex Water … Bored piling at Pole Rue WTC … … sufficient water supply to the local area. … Chard, Somerset …
Keller
, in partnership with Wessex Water, designed suitable piled …
/projects/pole-rue-water-treatment-centre
A465 Heads of the Valley (Rock Anchors)
Project
…
Keller
were employed to install rock anchors, up to 13 strands and … area was very narrow and near protected trees and overhead cables. …
Keller
UK … Costain … Welsh Government … The anchors being installed … The A465 is
a
key strategic corridor connecting the M4 in South Wales to England.
A
…
/projects/a465-heads-valley-rock-anchors
Geotechnical Sustainability – Where do we start?
News article
… from an expense into an investment for these companies requires
a
good understanding of what drives geotechnical sustainability. … overview was written by Luke Deamer with the support of
Keller
and the Centre for Environment and Sustainability, with … from Züblin. The full report can be found below. … Going green …
Keller
is starting to tackle the issue of sustainability in geotechnical …
/news/geotechnical-sustainability-where-do-we-start
Show more results