Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (312)
  • Project (103)
  • Resource (56)
  • News article (53)
  • Content page (29)
  • Technique (29)
  • Solution (12)
  • Event (8)
  • Market (8)
  • Office (8)
  • Landing page (4)
  • Vacancy (2)
Request a quote
Get assistance
Anker Valley
Project
Anker Valley Three years of planning resulted in the construction of retaining walls to complement the layout of a large housing development Anker Valley, Tamworth A permacrib retaining wall at Anker…
/projects/anker-valley
Secant box test pit
Project
Secant box test pit Keller UK called on the expertise of colleagues from abroad to come up with an innovative solution to create an underground testing pit at and oil and gas facility. Montrose-…
/projects/secant-box-test-pit
Pole Rue Water Treatment Centre
Project
Pole Rue Water Treatment Centre There was a requirement to expand the Pole Rue Water Treatment Works to provide sufficient water supply to the local area. Bored piling at Pole Rue WTC Bored piling at…
/projects/pole-rue-water-treatment-centre
Twickenham Station Development
Project
Twickenham Station Development Flats and offices are to be created in the space above the platforms at Twickenham Station. Twickenham Station Development CFA piling at Twickenham Station The project…
/projects/twickenham-station-development
Thames Tideway
Project
Thames Tideway The Thames Tideway is a 25km long tunnel running mostly along the line of the River Thames through central London. It will provide capture, storage and conveyance of almost all the…
/projects/thames-tideway
Hayes and Harlington Station
Project
Hayes and Harlington Station A number of major upgrades are being carried out by Network Rail at stations on this section of the Crossrail (Elizabeth Line) route in preparation for the start of…
/projects/hayes-and-harlington-station
Woodsmith Mine Shaft
Project
Woodsmith Mine Shaft Sirius Minerals are developing the world’s largest mine for polyhalite, a naturally occurring fertilizer used in agriculture. As the site is in the North York Moors National Park…
/projects/woodsmith-mine-shaft
Project Munio
Project
Project Munio The Environment Agency is carrying out a number of upgrades along the River Derwent to accommodate future regeneration of the area. Project Munio, Derby Project Munio, Derby The project…
/projects/project-munio
Tadcaster Bridge Stabilisation
Project
Tadcaster Bridge Stabilisation Heavy rain over Christmas 2015 led to the partial collapse of Tadcaster Bridge which connected the two halves of the town. Pali Radice mini piling at Tadcaster Bridge…
/projects/tadcaster-bridge-stabilisation
425 Oxford Street
Project
425 Oxford Street The project involved the creation of a new global Adidas flagship store in a prime retail location opposite Selfridges department store in the heart of London’s West End. 425 Oxford…
/projects/425-oxford-street
Crown Dock
Project
Crown Dock Anchors were required to provide stability to a new sheet piled wall at Crown Dock, Hull. Installing SBMA at Crown Docks, Hull Installing SBMA at Crown Docks, Hull The project Due to years…
/projects/crown-dock
Leeds Logic Industrial Park, Plot B
Project
Leeds Logic Industrial Park, Plot B The development is a new unit at Logic Park Industrial Park, Leeds and required regrading of part of the sloping site and steepening of the slope to the North of…
/projects/leeds-logic-industrial-park-plot-b
A13 carriageway widening
Project
A13 carriageway widening Work to widen the A13 from two to three lanes in both directions between the A128 and the A1014 was necessary to improve traffic flows and boost the local economy. Work on…
/projects/a13-carriageway-widening
Woodsmith Polyhalite Mine
Project
Woodsmith Polyhalite Mine Sirius Minerals are developing the world’s largest mine for polyhalite, a naturally occurring fertilizer used in agriculture. As the site is in the North York Moors National…
/projects/woodsmith-polyhalite-mine
Project Churchill, Jaguar Land Rover
Project
Project Churchill, Jaguar Land Rover Jaguar Land Rover are increasing the size of their global headquarters in Whitley, Coventry to include new office and factory buildings. Project Churchill The…
/projects/project-churchill-jaguar-land-rover
South Cliff Stabilisation Scheme
Project
South Cliff Stabilisation Scheme Scarborough Spa is a Grade II listed building in South Bay, Scarborough, North Yorkshire, which is used as an events and entertainment venue. Work was needed to…
/projects/south-cliff-stabilisation-scheme
Duke Shore Wharf
Project
Duke Shore Wharf Team 2100 is the Environment Agency’s 10-year programme to refurbish and replace tidal flood defences in London and the Thames estuary. At Duke Shore Wharf progressive wall…
/projects/duke-shore-wharf
McArthur Glen Shopping Centre
Project
McArthur Glen Shopping Centre McArthur Glen carried out a £90m extension to their designer outlet, making it one of the biggest in the South of England. The expansion introduced more than 40 new…
/projects/mcarthur-glen-shopping-centre
Boston Tidal Barrier
Project
Boston Tidal Barrier The £100m Boston Barrier Tidal Flood Alleviation Scheme provides improved flood protection to more than 13,732 homes and businesses, protecting against tidal surges such as the…
/projects/boston-tidal-barrier
A465 Heads of the Valley road
Project
A465 Heads of the Valley road The A465 is a key strategic corridor connecting the M4 in South Wales to England. A study in the 1990s identified that improvement of the road was critical to the social…
/projects/a465-heads-valley-road

Pagination

  • Previous page ‹‹
  • Page 3
  • Next page ››
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo