Skip to main content
02476 511266
Service Menu
  • News
  • Events
  • Resources
  • Worldwide contacts
Home
Main Menu
  • Expertise
    • Techniques
      • Ground improvement
        • Vibro stone columns
        • Dynamic compaction
        • Vibro concrete columns
        • Vibro compaction
        • Dry soil mixing
        • Mixed modulus columns CMM ®
        • Wet soil mixing
        • Rigid inclusions
        • Environmental stone columns
      • Grouting
        • Jet grouting
        • Compaction grouting
        • Compensation/fracture grouting
        • Permeation grouting
        • Rock/fissure grouting
      • Piling
        • CFA piles
        • Driven precast piles
        • Bored piles
        • Minipiles
        • Restricted access piles
        • Pali Radice
      • Earth retention
        • Contiguous pile walls
        • King post wall
        • Secant pile walls
        • Anchors - single bond length
        • SBMA
        • Soil nails
        • Slurry cut-off walls
        • Retaining structures
      • Instrumentation and monitoring
        • Instrumentation and monitoring
    • Solutions
      • Improve bearing capacity
        • Bearing capacity / settlement control
        • Piling
        • Re-levelling structures
        • Underpinning
      • Containment
      • Excavation support
      • Stabilisation
        • Solution feature stabilisation
        • Track Bed stabilisation
        • Tunnelling grouting / Compensation grouting
      • Groundwater control
      • Slope stabilisation
      • Instrumentation & monitoring
    • Markets
      • Commercial
      • Industrial
      • Infrastructure
      • Institutional/public
      • Power
      • Residential
  • Projects
  • How we work
    • Code of conduct
    • Values
    • Health and safety
    • Quality
    • Sustainability
    • Employment practices
    • Equality, diversity and inclusion
  • About us
    • Our history
    • Our team
    • About Keller UK
    • About Keller Group
  • Careers
Search
Menu
Close
Contact US Dropdown Menu
  • Contact us
    • Local offices
    • Request a quote
    • Get assistance

Search results

Filter results

  • All results (29)
  • Content page (0)
  • Event (0)
  • Landing page (1)
  • Market (0)
  • News article (6)
  • Office (0)
  • Project (16)
  • Resource (3)
  • Solution (0)
  • Technique (3)
  • Vacancy (0)
Request a quote
Get assistance
Duke Shore Wharf
Project
… Duke Shore Wharf Team 2100 is the Environment Agency’s 10-year programme to refurbish and replace tidal flood defences in London and the Thames estuary. At Duke Shore Wharf progressive wall strengthening techniques were undertaken on this small and highly sensitive site next to the River Thames. Work going on at Duke Shore Wharf The project The scope of the works comprised the design and installation of a …
/projects/duke-shore-wharf
Ebbsfleet Green
Project
/projects/ebbsfleet-green
Oakgrove Residential Development
Project
… which Keller solved by using two different techniques. Oakgrove Residential Development, near Milton Keynes The project Crest planned a development of approximately 1000 homes on a …
/projects/oakgrove-residential-development
Norton House
Project
… distribution layer, all designed by Keller.    Diagram shows placement of Rigid Inclusions near the sewer Project facts Owner(s) Legal & General Assurance Ltd Keller business unit(s) …
/projects/norton-house
Shirebrook Distribution Depot
Project
… Shirebrook Distribution Depot At the site of a former opencast coal working near Mansfield, Keller have undertaken two major Dynamic compaction projects. Shirebrook …
/projects/shirebrook-distribution-depot
Earlswood Lakes
Project
… Earlswood Lakes Earlswood Lakes are situated near Solihull, Birmingham. The underlying ground strata that surrounds the lakes is starting to …
/projects/earlswood-lakes
Drump Road
Project
… Drump Road Network Rail identified an abandoned mine shaft near to live London-Penzance Railway line. It was decided that the best way to treat and …
/projects/drump-road
Anker Valley
Project
/projects/anker-valley
Whitby Maritime Hub
Project
… use of shallow simply reinforced footings and was also low vibration as work was taking place near existing services and retaining structures.  The project The construction of a new Maritime …
/projects/whitby-maritime-hub
Crossrail C298
Project
/projects/crossrail-c298
Heathrow Airport
Project
… dry open hole drilling within the founding clay strata. Ground anchorage entries were located near the top of the diaphragm wall with installed lengths between 38m and 46m at 35 degrees to …
/projects/heathrow-airport
Horfield Cutting
Project
/projects/horfield-cutting
Jackfield Stabilisation Project
Project
… the valley sides. The 600mm diameter piles were reinforced with 457mm x 10mm CHS tube. Piles near to the river itself in a particularly unstable area of the slope were installed using …
/projects/jackfield-stabilisation-project
Betley Waste Water Treatment Works
Project
/projects/betley-waste-water-treatment-works
A465 Heads of the Valley (Rock Anchors)
Project
… the underlying sandstone/ironstone and mudstone rocks. The working area was very narrow and near protected trees and overhead cables. The solution The client’s designer wanted assurity in …
/projects/a465-heads-valley-rock-anchors
Rhodes House Redevelopment
Project
… tolerances needed to be very small and any movement needed to be detected and reported near instantly. The installation of automated sensors would be under strict time and access …
/projects/rhodes-house-redevelopment
Footer CTAs
  • Request a quote
  • Get assistance
  • Contact us

© 2025 Copyright Keller Limited

Registered in England No: 00485692
Registered office: Oxford Road,
Ryton-on-Dunsmore, Coventry CV8 3EG

Footer links
  • Keller Group
  • Careers
  • Modern slavery and human trafficking statement
  • S172 statement
  • Pension Statement of Investment Principles
  • Pension Implementation Statement

Register for alerts

Click on the button below to select the types of alerts you would like to receive

Register for alerts
Legal links
  • Terms of use
  • Privacy Policy
  • Manage cookies
  • Accessibility
  • Sitemap
Social links
  • Facebook
  • LinkedIn
  • Instagram
  • YouTube
Federation of Piling Specialists accredited logo
Disability Confident Employer logo
The Keller Way
Supply Chain Sustainability School Gold Badge
RoSPA Gold Award 2024
Women into Construction 2023 logo