Skip to main content
02476 511266
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Employment practices
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Longbridge
Project
Longbridge The complete design and build solution for a housebuilder keen to manage slope stability on their site. Ensuring the correct positioning of a steel column in a king post wall Ensuring the…
/projects/longbridge
Upper Holloway Bridge
Project
Upper Holloway Bridge The upgrading of the UK's Victorian rail network requires ever more innovative solutions such as the use of strand anchors to support bridge abutments. Upper Holloway…
/projects/upper-holloway-bridge
NHBC Building for tomorrow 2019
Event
NHBC Building for tomorrow 2019 York York Racecourse 5 Mar 2019 Seminar http://www.nhbc.co.uk/AwardsandEvents/building-for-tomorrow/ Visit our stand and find out about the wide range of ground…
/events/nhbc-building-tomorrow-2019
Oakgrove Residential Development
Project
Oakgrove Residential Development The site of a former shallow gravel pit on the southern fringe of Milton Keynes presented several challenges which Keller solved by using two different techniques.…
/projects/oakgrove-residential-development
Secondment helps Keller UK extend product range
News article
Secondment helps Keller UK extend product range News article category Workplace and people A secondment in France has paid rich dividends for Keller UK and design engineer Arul Shankar. Keller rig…
/news/secondment-helps-keller-uk-extend-product-range
Keller ensures all staff are leaders when it comes to safety
News article
Keller ensures all staff are leaders when it comes to safety News article category Workplace and people Keller UK have now delivered their cultural change 'Step Forward for Safety'…
/news/keller-ensures-all-staff-are-leaders-when-it-comes-safety
Keller Britain's Most Admired Company in Heavy Construction
News article
Keller Britain's Most Admired Company in Heavy Construction News article category Workplace and people Keller, the world's largest geotechnical contractor, has been named Britain's…
/news/keller-britains-most-admired-company-heavy-construction
Pali Radice
Technique
Pali Radice Pali Radice (literal translation ‘Root Pile’ from the Italian) is a versatile foundation system using small diameter cast in situ bored piles, developed in Italy in the 1950s. It has been…
/expertise/techniques/pali-radice
Benjamin Street
Project
Benjamin Street Keller were asked to install CFA piles for a secant piled wall to form a basement at a residential development on a site in a very congested area of London. A secant pile wall at…
/projects/benjamin-street
Napier Park
Project
Napier Park To allow for the construction of an 800-plot housing development in Luton, a sloped area of the site had to be plateaued to allow installation of a king post wall behind the housing plots…
/projects/napier-park
Alexandra Dock
Project
Alexandra Dock At the site of a former warehouse within Alexandra Dock, Liverpool, Keller installed their patented rigid inclusion system to support a new distribution facility. Rigid Inclusions in…
/projects/alexandra-dock
Download
https://youtu.be/VKXNwobOS8w
King post wall video
Resource
King post wall video KIng post wall installation, Luton Video The installation of a king post wall at Napier Park, Luton Download https://youtu.be/VKXNwobOS8w
/node/2941
Download
Recent advances in BIM in geotechnics
Resource
Recent advances in BIM in geotechnics Paper by Jim De Waele looking at recent advances in BIM in the field of geotechnics Technical paper Accessing and sharing site data Download
/node/2961
Download
Gender Pay Gap Report 2017
Resource
Gender Pay Gap Report 2017 Keller UK's gender pay gap report for 2017 Report Gender pay gap reporting for Keller UK Download
/node/2966
Graduate programme
Content page
Graduate programme We are committed to an annual intake of graduates in all divisions across the company, and strive to offer the best experience possible. So we are always keen to hear from students…
/careers/career-paths/graduate-programme
Apprenticeships
Content page
Apprenticeships If you're preparing to leave school and keen to get a head start, becoming a Keller apprentice offers you exactly that. You'll earn a salary while working and gaining…
/careers/career-paths/apprenticeships
Internships and work placements
Content page
Internships and work placements Start your professional journey through internships and work placements at Keller. These opportunities are designed for people looking to build work experience and…
/careers/career-paths/work-placements
Keller UK
Office
Keller UK Head Office Coventry T: +44 (0)2476 511266 +442476511266 Mark M: +44 (0)7557 033271 +447557033271 Derek M: +44 (0)7769 654163 +447769654163
[email protected]
Oxford Road Ryton-on-…
/contact-us/keller-uk
Retaining structures
Technique
Retaining structures Our sister company, Phi Group , offers a range of retaining wall and reinforced soil systems including the Permacrib gravity system; the Andacrib modular precast concrete crib…
/expertise/techniques/retaining-structures
Drump Road
Project
Drump Road Network Rail identified an abandoned mine shaft near to live London-Penzance Railway line. It was decided that the best way to treat and stabilise the ground was jet grouting of the shaft…
/projects/drump-road
Pagination
Previous page
‹‹
Page 5
Next page
››