Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Heathrow Airport
Project
… To eliminate the need for heavy wailing and propping in the main
excavation
area, thus reducing 'working at height' and heavy lifting (airside) and allowing ease of access for bulk
excavation
. … Keller UK … Balfour Beatty … British Airports Authority … … design, supply and installation of ground anchorages to temporarily
support
the diaphragm walls during basement
excavation
and construction …
/projects/heathrow-airport
Secant box test pit
Project
/projects/secant-box-test-pit
London Power Tunnels 2
Project
… … Hurst, London … Ground treatment was specified as a means of
excavation
support
for shafts and tunnelling construction activities associated at …
/projects/london-power-tunnels-2
Leeds Logic Industrial Park, Plot B
Project
… soil nails were completed with structural mesh and head plates to
support
the excavated face. During the works Keller used a traditional …
/projects/leeds-logic-industrial-park-plot-b
Corsham Aqueduct
Project
… … Corsham … The installation of mini piles to provide the foundations
support
to a new aqueduct over the railway as part of the Great Western … of a contiguous pile wall with a double function, as the temporary
support
for the safe installation of the main bearing piles and as the … a standard drilling rig. The main piles were installed following
excavation
of the wall with a drill mast mounted on a specially adapted …
/projects/corsham-aqueduct
Down Leisure Centre
Project
… and reduce the permeability of very weak silts, enabling the safe
excavation
of deep plant and pump rooms. … Keller UK … Felix O'Hare and …
/projects/down-leisure-centre
Upper Holloway Bridge
Project
… 34 No. 2 unit SBMA strand anchors to resist 155kN axial loads to
support
the existing abutments in the temporary loading condition when … ever more innovative solutions such as the use of strand anchors to
support
bridge abutments. … London … A new bridge deck to one of …
/projects/upper-holloway-bridge
425 Oxford Street
Project
/projects/425-oxford-street
Alexandra Dock
Project
… Liverpool, Keller installed their patented rigid inclusion system to
support
a new distribution facility. … Liverpool … Some 4412 columns
support
the building. The very dense sub base sitting beneath the old …
/projects/alexandra-dock
Beckton STW Shaft Construction
Project
… of the chalk below the shaft to mitigate ground water inflow during
excavation
. … A total of 21 boreholes were drilled and grouted using …
/projects/beckton-stw-shaft-construction
Crossrail C298
Project
… To stabilise very soft clays and organic soil to
support
the construction plans and to validate their solution with … and 10 new stations across 40 construction sites. … London … To
support
the safe construction of a 4.0m high retaining wall for the … to provide the required bearing capacity and settlement control to
support
the retaining wall. Keller undertook an up-front programme of …
/projects/crossrail-c298
Ebbsfleet Green
Project
/projects/ebbsfleet-green
Hayes and Harlington Station
Project
… … The installation of a number of 600mm, 450mm & 300mm SFA piles to
support
the construction of new platforms. … Europe …
/projects/hayes-and-harlington-station
Victoria Station upgrade
Project
… around all of the proposed tunnels and excavations and so allow safe
excavation
through solid ground. … Overlapping columns ranging in …
/projects/victoria-station-upgrade
Skelton Gate
Project
… around 12-14m of improved ground. Raft foundations were then used to
support
houses. Gabion Walls were also installed by Phi Group to
support
the new access road to the site. … Europe …
/projects/skelton-gate
Clive Booth Student Village
Project
…
The
main challenge was to provide a solution through
the
weak …
the
overall programme. … Oxford Brookes University …
The
construction
of
three, five and six storey student residential blocks at Clive Booth Student Village which is part
of
Oxford Brookes University. … RIs were installed beneath
the
raft …
/
projects
/clive-booth-student-village
Crossrail C300/C410
Project
/projects/crossrail-c300c410
Erith Distribution Warehouse
Project
… slab piles. This in turn minimised pile breakdown and provided a
sustainability
benefit to the project by removing waste disposal of …
/projects/erith-distribution-warehouse
Woodsmith Polyhalite Mine
Project
/projects/woodsmith-polyhalite-mine
Vanguard Self-Storage
Project
… for the proposed column loadings of up to 2200kN that required
support
. … Keller UK … UC Build (North) Ltd … Vanguard Holdings …
/projects/vanguard-self-storage
Show more results