Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Wet soil mixing
Mixed modulus columns CMM ®
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Heathrow Airport
Project
… To eliminate the need for heavy wailing and propping in the main
excavation
area, thus reducing 'working at height' and heavy lifting (airside) and allowing ease of access for bulk
excavation
. … Keller UK … Balfour Beatty … British Airports Authority … … design, supply and installation of ground anchorages to temporarily
support
the diaphragm walls during basement
excavation
and construction …
/projects/heathrow-airport
Secant box test pit
Project
… A 3D image of the secant wall box …
Excavation
of the wall begins … The building housing the test pit … The … to create a Centre of Excellence at their Montrose Campus to
support
the oil and gas industry. During the construction within the live compound, there was a need to construct foundations to
support
a new shed facility and its underground testing pit. … The 900mm …
/projects/secant-box-test-pit
London Power Tunnels 2
Project
… … Hurst, London … Ground treatment was specified as a means of
excavation
support
for shafts and tunnelling construction activities associated at …
/projects/london-power-tunnels-2
Leeds Logic Industrial Park, Plot B
Project
… Installing the
soil
nails … The
soil
nailed slope …
Soil
nail installation in very stiff clay and weathered mudstone and … for one geotechnical contractor to carry out the complete package of
soil
nailing and facing system. During the main works Keller installed …
/projects/leeds-logic-industrial-park-plot-b
Corsham Aqueduct
Project
… … Corsham … The installation of mini piles to provide the foundations
support
to a new aqueduct over the railway as part of the Great Western … of a contiguous pile wall with a double function, as the temporary
support
for the safe installation of the main bearing piles and as the … a standard drilling rig. The main piles were installed following
excavation
of the wall with a drill mast mounted on a specially adapted …
/projects/corsham-aqueduct
Down Leisure Centre
Project
… O'Hare and Co Ltd … Down County Council … Down Leisure Centre wet
soil
mixing
… Keller imported a technique used by colleagues in Scandinavia … plant for the new Down Leisure Centre, Downpatrick. … A wet
soil
mixing
solution was undertaken as excavations down to 5m depth for …
/projects/down-leisure-centre
425 Oxford Street
Project
… pile cap extensions or over cap construction and the associated
excavation
works and programme implications. It provided a positive …
/projects/425-oxford-street
Upper Holloway Bridge
Project
… 34 No. 2 unit SBMA strand anchors to resist 155kN axial loads to
support
the existing abutments in the temporary loading condition when … ever more innovative solutions such as the use of strand anchors to
support
bridge abutments. … London … A new bridge deck to one of …
/projects/upper-holloway-bridge
Alexandra Dock
Project
… Liverpool, Keller installed their patented rigid inclusion system to
support
a new distribution facility. … Liverpool … Some 4412 columns
support
the building. The very dense sub base sitting beneath the old …
/projects/alexandra-dock
Beckton STW Shaft Construction
Project
… of the chalk below the shaft to mitigate ground water inflow during
excavation
. … A total of 21 boreholes were drilled and grouted using …
/projects/beckton-stw-shaft-construction
Ebbsfleet Green
Project
/projects/ebbsfleet-green
Crossrail C298
Project
… To stabilise very soft clays and organic soil to
support
the construction plans and to validate their solution with … and 10 new stations across 40 construction sites. … London … To
support
the safe construction of a 4.0m high retaining wall for the … to provide the required bearing capacity and settlement control to
support
the retaining wall. Keller undertook an up-front programme of …
/projects/crossrail-c298
Hayes and Harlington Station
Project
… … The installation of a number of 600mm, 450mm & 300mm SFA piles to
support
the construction of new platforms. … Europe …
/projects/hayes-and-harlington-station
Victoria Station upgrade
Project
… around all of the proposed tunnels and excavations and so allow safe
excavation
through solid ground. … Overlapping columns ranging in …
/projects/victoria-station-upgrade
Skelton Gate
Project
… around 12-14m of improved ground. Raft foundations were then used to
support
houses. Gabion Walls were also installed by Phi Group to
support
the new access road to the site. … Europe …
/projects/skelton-gate
Clive Booth Student Village
Project
… through the weak water-bearing Head and Temple Cowley deposits to
support
significant loadings, while accommodating multiple working … beneath the raft foundations as illustrated below, providing
support
to heavy raft foundations with an average SLS of 100kN/m2. This …
/projects/clive-booth-student-village
Crossrail C300/C410
Project
/projects/crossrail-c300c410
Erith Distribution Warehouse
Project
… follow on with pile cap construction. DCIS piles were installed to
support
the floor slab were then installed behind the perimeter piles. A …
/projects/erith-distribution-warehouse
Woodsmith Polyhalite Mine
Project
… bottom of the large shaft. … The installation of 750 mm SFA piles to
support
the production shaft head gear using the PRA S line rock auger …
/projects/woodsmith-polyhalite-mine
Vanguard Self-Storage
Project
… for the proposed column loadings of up to 2200kN that required
support
. … Keller UK … UC Build (North) Ltd … Vanguard Holdings …
/projects/vanguard-self-storage
Show more results