Skip to main content
02476 511266
Service Menu
News
Events
Resources
Careers
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
A465
Heads
of the
Valley
road
Project
… Costain to provide design advice for retaining structures alongside
the
road and
the
most appropriate solutions to overcome significant … along
the
route. … Phi Group … Costain … Welsh Government … One
of
the
Phi Textomur walls …
The
A465 is a key strategic corridor …
the
road was critical to
the
social and economic regeneration
of
the
Heads
of
the
Valleys area. … Gilwern to Brynmawr, South Wales …
The
…
/
projects
/a465-
heads
-
valley
-road
A465
Heads
of the
Valley
(Rock Anchors)
Project
… to 13 strands and depths ranging up to 45m, with rock socket lengths
of
over 20m into
the
underlying sandstone/ironstone and mudstone rocks.
The
working area …
the
road was critical to
the
social and economic regeneration
of
the
Heads
of
the
Valleys area. … South Wales … Retaining wall 14/14A
of
the
…
/
projects
/a465-
heads
-
valley
-rock-anchors
Anker
Valley
Project
…
The
main challenge was identifying during
the
design stage how
the
two … arrived at.
The
construction was more straightforward, with long runs
of
Permacrib retaining walls to build. … Travis Baker … Phi Group … Bellway Homes … Bellway Homes … A permacrib retaining wall at Anker
Valley
… Three years
of
planning resulted in
the
construction
of
…
/
projects
/anker-
valley
Project
Munio
Project
… Due to
the
project
location many challenges were present. Derby is a thriving city … Munio, Derby …
The
Environment Agency is carrying out a number
of
upgrades along
the
River Derwent to accommodate future regeneration …
/
projects
/
project
-munio
Jackfield Stabilisation
Project
Project
…
The
main challenge was safely installing
the
18m long piles using a … into mudstone with
the
piling mat being carefully monitored for signs
of
movement by Getec, Keller's monitoring and instrumentation company. … sandstone and mudstone bedrock in a series
of
rows extending up
the
valley
sides.
The
600mm diameter piles were reinforced with 457mm x 10mm …
/
projects
/jackfield-stabilisation-
project
Project Mint, O2 Arena
Project
… undertaken while the main arena remained open. Space proved to be
a
challenge throughout, with the team working in the confines of
a
tent … the height of machinery able to operate within the space. …
Keller
UK … ISG … Anschutz Entertainment Group (AEG) … Work going on … shopping centre. … For the foundations of the new shopping centre,
Keller
installed 263 No 300m diameter restricted access piles, which …
/projects/project-mint-o2-arena
Project
Churchill, Jaguar Land Rover
Project
…
The
main challenge was installing 60m
of
retaining wall for a retained height
of
2.5m. Drainage and other site infrastructure had already been …
/
projects
/
project
-churchill-jaguar-land-rover
Erith Distribution Warehouse
Project
… follow on with pile cap construction. DCIS piles were installed to
support
the floor slab were then installed behind the perimeter piles. A …
/projects/erith-distribution-warehouse
Earlswood Lakes
Project
… To install a flood alleviation scheme to help protect
the
local village from any future flooding.
The
proposed works were situated close to
the
reservoir along
the
towpath
of
Valley
Road and close to other amenities, making a successful
project
…
/
projects
/earlswood-lakes
Beam Reach Business Park
Project
… One
of
the
four units had a complication. It was located adjacent to
the
HS1 … distribution and industrial units by Readie Construction. On this
project
, they chose Keller's displacement piling as a means
of
avoiding … finish them (as per
the
photo above) to a precise level tolerance.
Heads
are placed at +0/-25mm with
the
levelling controlled by ourselves. …
/
projects
/beam-reach-business-park
Daventry International Rail Freight Terminal
Project
…
The
site
of
the
new warehouse was 9.0m lower than
the
adjacent site where
the
rail … … Daventry International Rail Freight Terminal was to be
the
home
of
a new distribution warehouse for Sainsbury's supermarkets. … …
/
projects
/daventry-international-rail-freight-terminal
Clive Booth Student Village
Project
…
The
main challenge was to provide a solution through
the
weak …
the
overall programme. … Oxford Brookes University …
The
construction
of
three, five and six storey student residential blocks at Clive Booth Student Village which is part
of
Oxford Brookes University. … RIs were installed beneath
the
raft …
/
projects
/clive-booth-student-village
Epping Forest Retail Park
Project
… Vibro stone columns at Epping … Epping Forest Retail Park …
The
rear
of
the
site was underlain by a wedge
of
fill materials up to … with a wedge
of
alluvial deposits as
the
site lay within
the
Roding
Valley
, a tributary
of
the
Thames.
The
alluvium increased in thickness …
/
projects
/epping-forest-retail-park
Woodsmith Polyhalite Mine
Project
… bottom of the large shaft. … The installation of 750 mm SFA piles to
support
the production shaft head gear using the PRA S line rock auger …
/projects/woodsmith-polyhalite-mine
Recycling facility, Reliance Street
Project
… To minimise
the
environmental impact it was decided to provide a rigid inclusion … and carbon reductions over CFA piles with
the
added cost-saving bonus
of
using
the
same rig for both techniques.
The
main challenge was … within
the
deepest fills inclusive
of
900-1050mm diameter flared
heads
. These were bored into glacial deposits to accommodate axial …
/
projects
/recycling-facility-reliance-street
Alexandra Dock
Project
… To provide a foundation solution through up to 15.0m
of
very low strength made ground and low to moderate strength clays while minimising vibration and load shed onto
the
nearby dock wall.
The
specified requirement for a very high slab … solution for
the
whole structure which would have impacted
the
project
cost and timescales and generated significant quantities
of
…
/
projects
/alexandra-dock-0
Crossrail C300/C410
Project
/projects/crossrail-c300c410
Four Ashes
Project
/projects/four-ashes
Victoria Station upgrade
Project
… around all of the proposed tunnels and excavations and so allow safe
excavation
through solid ground. … Overlapping columns ranging in …
/projects/victoria-station-upgrade
Leeds Logic Industrial Park, Plot B
Project
… Installing
the
soil nails …
The
soil nailed slope … Soil nail installation in very … new unit at Logic Park Industrial Park, Leeds and required regrading
of
part
of
the
sloping site and steepening
of
the
slope to
the
North
of
the
…
/
projects
/leeds-logic-industrial-park-plot-b
Show more results