Skip to main content
02476 511266
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Employment practices
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
Jackfield Stabilisation Project
Project
Jackfield Stabilisation Project Jackfield is a well known area of historic active landslip at one of the narrowest points on the River Severn in Shropshire. It is located 1km downstream of Ironbridge…
/projects/jackfield-stabilisation-project
Hansford Park
Project
Hansford Park Keller made two visits to Hansford Park development on the site of the old Radio Mast in Rugby to install driven precast piles on former farmland where there were concerns over how the…
/projects/hansford-park
141 Harley Street
Project
141 Harley Street Keller's specialist restricted access team designed and constructed a 73 linear metre secant piled retaining wall and a 35 linear metre contiguous piled retaining wall using…
/projects/141-harley-street
Betley Waste Water Treatment Works
Project
Betley Waste Water Treatment Works Keller were called in to offer a foundations solution for the installation of 1.0m diameter waste water pipe as part of the Betley WwTW project. Keller UK completes…
/projects/betley-waste-water-treatment-works
Heathrow Airport
Project
Heathrow Airport Careful planning of the logistics before work started onsite was the key to the successful completion of this project, which involved working airside at a major international airport…
/projects/heathrow-airport
Crag End Landslip
Project
Crag End Landslip Keller used two of their geotechnical solutions to stabilise a 300m stretch of road in challenging ground condtions. Bored piles at Crag End Bored piles at Crag End The project…
/projects/crag-end-landslip
Herns Lane
Project
Herns Lane An unusual treatment for a housing site which goes to prove that whatever the ground conditions, Keller has the solution. Compaction grouting at Herns Lane Compaction grouting at Herns…
/projects/herns-lane
Victoria Station upgrade
Project
Victoria Station upgrade As part of the £700m upgrade of London's Victoria Station, Keller undertook what was at the time Europe's largest jet grouting project using Building Information…
/projects/victoria-station-upgrade
New Cross shaft
Project
New Cross shaft Keller was called in to reduce the permeability of the chalk in a shaft which was to be a starter pit for a new power cable tunnel beneath the River Thames. Permeation grouting at New…
/projects/new-cross-shaft
Marble Arch Place
Project
Marble Arch Place To the north of Park Lane overlooking Hyde Park, the £400million Marble Arch Place development is one of the most prestigious recent construction projects in London. Two Keller UK…
/projects/marble-arch-place
Longbridge
Project
Longbridge The complete design and build solution for a housebuilder keen to manage slope stability on their site. Ensuring the correct positioning of a steel column in a king post wall Ensuring the…
/projects/longbridge
Upper Holloway Bridge
Project
Upper Holloway Bridge The upgrading of the UK's Victorian rail network requires ever more innovative solutions such as the use of strand anchors to support bridge abutments. Upper Holloway…
/projects/upper-holloway-bridge
Oakgrove Residential Development
Project
Oakgrove Residential Development The site of a former shallow gravel pit on the southern fringe of Milton Keynes presented several challenges which Keller solved by using two different techniques.…
/projects/oakgrove-residential-development
Benjamin Street
Project
Benjamin Street Keller were asked to install CFA piles for a secant piled wall to form a basement at a residential development on a site in a very congested area of London. A secant pile wall at…
/projects/benjamin-street
Napier Park
Project
Napier Park To allow for the construction of an 800-plot housing development in Luton, a sloped area of the site had to be plateaued to allow installation of a king post wall behind the housing plots…
/projects/napier-park
Alexandra Dock
Project
Alexandra Dock At the site of a former warehouse within Alexandra Dock, Liverpool, Keller installed their patented rigid inclusion system to support a new distribution facility. Rigid Inclusions in…
/projects/alexandra-dock
Drump Road
Project
Drump Road Network Rail identified an abandoned mine shaft near to live London-Penzance Railway line. It was decided that the best way to treat and stabilise the ground was jet grouting of the shaft…
/projects/drump-road
Horfield Cutting
Project
Horfield Cutting The Great Western Route is undergoing a period of modernisation with the upgrading of infrastructure to makes journeys faster and services more reliable. Part of this scheme is the…
/projects/horfield-cutting
Ebbsfleet Green
Project
Ebbsfleet Green Redrow Homes secured suitable land to develop a large housing site at Ebbsfleet in Kent, which is a prime location to commute into the City of London. The scheme also involved the…
/projects/ebbsfleet-green
Daventry International Rail Freight Terminal
Project
Daventry International Rail Freight Terminal Daventry International Rail Freight Terminal was to be the home of a new distribution warehouse for Sainsbury's supermarkets. Daventry International…
/projects/daventry-international-rail-freight-terminal
Pagination
Previous page
‹‹
Page 2
Next page
››