Skip to main content
02476 511266
Service Menu
News
Events
Resources
Worldwide contacts
Main Menu
Expertise
Techniques
Ground improvement
Vibro stone columns
Dynamic compaction
Vibro concrete columns
Vibro compaction
Dry soil mixing
Mixed modulus columns CMM ®
Wet soil mixing
Rigid inclusions
Environmental stone columns
Grouting
Jet grouting
Compaction grouting
Compensation/fracture grouting
Permeation grouting
Rock/fissure grouting
Piling
CFA piles
Driven precast piles
Bored piles
Minipiles
Restricted access piles
Pali Radice
Earth retention
Contiguous pile walls
King post wall
Secant pile walls
Anchors - single bond length
SBMA
Soil nails
Slurry cut-off walls
Retaining structures
Instrumentation and monitoring
Instrumentation and monitoring
Solutions
Improve bearing capacity
Bearing capacity / settlement control
Piling
Re-levelling structures
Underpinning
Containment
Excavation support
Stabilisation
Solution feature stabilisation
Track Bed stabilisation
Tunnelling grouting / Compensation grouting
Groundwater control
Slope stabilisation
Instrumentation & monitoring
Markets
Commercial
Industrial
Infrastructure
Institutional/public
Power
Residential
Projects
How we work
Code of conduct
Values
Health and safety
Quality
Sustainability
Employment practices
Equality, diversity and inclusion
About us
Our history
Our team
About Keller UK
About Keller Group
Careers
Contact US Dropdown Menu
Contact us
Local offices
Request a quote
Get assistance
Search results
Search
Sort by
Relevance
Newest first
Oldest first
A465 Heads of the Valley (Rock Anchors)
Project
A465 Heads of the Valley (Rock Anchors) The A465 is a key strategic corridor connecting the M4 in South Wales to England. A study in the 1990s identified that improvement of the road was critical to…
/projects/a465-heads-valley-rock-anchors
Recycling facility, Reliance Street
Project
Recycling facility, Reliance Street Suez Recycling & Recovery UK were redeveloping and expanding an existing waste recycling facility in Newton Heath, Manchester. Installing rigid inclusions at…
/projects/recycling-facility-reliance-street
London Power Tunnels 2
Project
London Power Tunnels 2 LPT2 is the second phase of an ambitious project to ‘rewire London’ to future proof the capital’s electricity supplies. The project involves building 30km of cable tunnels…
/projects/london-power-tunnels-2
Crossrail C310
Project
Crossrail C310 Crossrail was in its day the largest construction project in Europe. It involved the construction of 42km of twin underground railway tunnels and 10 new stations across 40 construction…
/projects/crossrail-c310
Bilston Urban Village
Project
Bilston Urban Village Keller provided a cost and carbon saving option in challenging site conditions on a regeneration project. Close collaboration with remedial, mining, geotechnical, &…
/projects/bilston-urban-village
Earlswood Lakes
Project
Earlswood Lakes Earlswood Lakes are situated near Solihull, Birmingham. The underlying ground strata that surrounds the lakes is starting to degrade causing localised flooding in certain areas around…
/projects/earlswood-lakes
Tesco Store
Project
Tesco Store Keller delivered a low carbon scheme using rigid inclusions and Mixed Modulus Columns (CMM®) avoiding options which would have meant using more concrete. On site at Mablethorpe On site at…
/projects/tesco-store
Embankment Stabilisation Scheme
Project
Embankment Stabilisation Scheme An embankment between the Humber Estuary and the Network Rail Hull to Selby line needed strengthening after years of erosion. Keller on site at Hessle Keller on site…
/projects/embankment-stabilisation-scheme
Project Mint, O2 Arena
Project
Project Mint, O2 Arena The world-famous O2 Arena (formerly the Millennium Dome) underwent a two-year £71m upgrade project in 2018. Work going on inside the O2 Arena Work going on inside the O2 Arena…
/projects/project-mint-o2-arena
Lyons Park
Project
Lyons Park As part of the regeneration of the former Jaguar car plant site in Coventry, a food manufacturing facility was built for a major UK logistics provider. A rig on site at Lyons Park On site…
/projects/lyons-park
Whitworth Community High School
Project
Whitworth Community High School Replacement buildings were needed for a 750-place secondary school after the original buildings had come to the end of their lifecycle. Our scheme resulted in a…
/projects/whitworth-community-high-school
Lidl store
Project
Lidl store Vibro stone columns were the obvious choice here to facilitate the adoption of simple spread footings and ground bearing slabs on a Brownfield site. They were also able to be installed…
/projects/lidl-store
West Coventry Academy
Project
West Coventry Academy Working closely with Curtins Consulting, Keller delivered a low carbon foundations solution in line with the UK government’s energy consumption and net zero targets. Works were…
/projects/west-coventry-academy
Science Park restaurant
Project
Science Park restaurant Keller provided a low vibration fully displacement solution for a fast food restaurant on a site where there was a danger of forming a pathway to contaminate an aquifer below…
/projects/science-park-restaurant
Rhodes House Redevelopment
Project
Rhodes House Redevelopment GEO-Instruments have been working alongside their Keller colleagues on the £37m redevelopment of an historical building in Oxford. An engineer from GEO-Instruments monitors…
/projects/rhodes-house-redevelopment
Nuclear Advanced Manufacturing Research Centre
Project
Nuclear Advanced Manufacturing Research Centre Keller came up with a foundations solution on a site which could not be treated by vibro. The use of rigid inclusions avoided the need for piling,…
/projects/nuclear-advanced-manufacturing-research-centre
Blue Mountain Permanent Remediation
Project
Blue Mountain Permanent Remediation Keller were asked to provide a ground engineering solution for a continuing landslip remediation project on the East Coast mainline in Morpeth, Northumberland. …
/projects/blue-mountain-permanent-remediation
90 Long Acre
Project
90 Long Acre Originally built in the 1970s, Long Acre is a 240,000 sq ft landmark building in one of London's most popular areas. It is an iconic but obsolete Brutalist building in need of an…
/projects/90-long-acre
Clive Booth Student Village
Project
Clive Booth Student Village Keller came up with a Rigid Inclusion solution to replace the original piled option for a site that occupied multiple levels. The solution accelerated the follow-on works…
/projects/clive-booth-student-village
B&M Retail Unit
Project
B&M Retail Unit Rigid Inclusions delivered a cheaper, lower carbon and programme-saving alternative to driven piling for a retail unit. On site at Mablethorpe The project The construction of a…
/projects/bm-retail-unit
Pagination
Previous page
‹‹
Page 4
Next page
››